B4084 Repairs 14

In addition to the work on the canyon, a lot of work has been done on the storm drains either side. These are larger than before, and discharge on the downstream side of the bridge so that the run-off doesn't add to the stream water passing through. A lot of thought has gone into the planning for possible future floods!


lastindex pagenext